Autumn is over, can winter be far behind? The cold winter has come. Let's take a look at how to protect the mountain spring water treatment equipment.
Anti freezing measures for mountain spring water treatment equipment in winter:
Anti freezing of water meter: sand shall be used to bury the water meter well as much as possible to achieve the thermal insulation effect. Some thermal insulation materials can be used to wrap the water meter well for thermal insulation.
Anti freezing of valves: some thermal insulation materials must be used for thermal insulation.
Anti freezing of pipeline: it shall be buried below the anti freezing layer (30cm) as far as possible to prevent freezing of the pipeline. The exposed pipeline (especially the pipeline with north wind) must be wrapped with thermal insulation materials for insulation.
The motor is the first power for the production of the whole plant, and its operation directly affects the production. First, we should do a good job in oil filling and lubrication. We will oil the motors of the whole plant in batches.
Outdoor unit pump: the cooling water system of the unit pump shall be kept smooth. If the pump is a standby pump but not a key pump, it shall be emptied. If the key pump has a pre heating line, open the preheating valve. If there is no pre heating line, open the outlet valve of the standby pump slightly to make the high-pressure water at the outlet flow back to the inlet.
The above is to do a good job of mountain spring water treatment equipment maintenance skills when winter comes. I hope it will be helpful to you. More inquiries on the official website or call: 18118113112 13773235578